Case Studies

Pillinger Controls

Intelligent thinking reduced business continuity risk during limited power conditions

With limited space and structural loadings preventing the existing generator system from being expanded economically, we were
challenged to design a dynamic load management system to be integrated into the BEMS with improved functionality and flexibility for a global accountancy firm.

Read the full case study here.
Pillinger Controls